      Prestressed concrete construction method using relief points of web pane

      개요

      OUTLINE

      특징

      FEATURES

      • Transfer of 2nd tension force using docks between girders
      • Ease of equipment operation by dock installation
      • Tension work zone acquisition is possible and can shorten construction time by using the upper slab as a temporary support structure and through simultaneous work
      • Reduction in the number of necessary strands due to the efficient transfer of the 2nd tension force in the continuation of the girder
      • Complete or partial replacement is possible, and additional reinforcement is unnecessary when replacing the bottom plate
      시공순서

      CONSTRUCTION SEQUENCE